Twenty two no. Residential units, comprising of 16 no. 3 bed dwellings and 6 no. 4 bedroom dwellings to be built in two phases. Phase l – 9 no. 3 bed and 3 no. 4 bed houses 12units) and for the construction of a sewer line to connect from the castlepollard road to the south and onto the mullingar road link to the collinstown sewerage treatment plant. Phase 2 comprising 7 no. 3 bed and 3 no. 4 bed houses (10 units total). The development comprises all landscaping , open space areas, boundary treatments and all associated infrastructural works above and below ground.
To find out more details on this Residential Development in Westmeath Started on 2018-01-01 take the free trial here.

