Construction of a four-storey hotel extension (1944sq. M. Gross floor area, approximately) to the front (southwest) of the existing hotel building; demolition and reinstatement of existing hotel floorspace (172sq. M. ), removal of 3 no. Hotel bedrooms and relocation of existing ESB sub-station in order to facilitate the physical connection of the proposed extension; installation of plant room and reorientation of hotel lobby at ground floor level; and hotel accommodation (55 no. New hotel bedrooms) at ground 1st, 2nd and 3rd floor levels, resulting in a combined overall total of 182 no. Bedrooms (130 no. Existing bedrooms minus 3 no. Bedrooms to be demolished). The proposed new extension will have an overall height of 13. 8 metres, approximately, to top of plant/staircore. The development will also include: a wall-mounted, internally-illuminated hotel signage panel at third floor level (4th storey) affixed to the southeast and northwest elevations of the proposed hotel extension (2 no.no. in total); reduction in car parking spaces (from 116 no. to 95 no. spaces); new bicycle parking (18 no. spaces); boundary treatments (including removal of a section of a post and rail fence on the southwest boundary to facilitate sightlines); changes in level; drainage works; piped infrastructure and ducting, roof plant; and all associated site excavation works above and below ground all on a site of 0.93ha. approximately.

To find out more details on this Hotel & Guesthouse Development in Dublin Granted permission on 2018-04-25 take the free trial here.


Address:
Travellodge (Dublin Airport-North Swords)

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL