The phased alterations and change of use of Bay 1, some 2200 sq.m from Youth Resource/Social & Recreation Centre to warehousing. The works will include the following:

Phase 1: Removal of the existing subdivision of Bays 2, 3, 4 & 5 of the former Fulflex Building to enable the current 4 units to be returned to their former combined arrangement. Erection of a covered conveyor line between VPK Packaging Ltd production building to the former Fulflex Building.
Phase 2: Demolition of existing administration building along the front elevation of the former Fulflex Building to facilitate the increase of vehicular parking facilities to accommodate lorry parking bays and associated turning circle with associated site works. Removal of existing subdivisions between Bay 1 and adjoining bays to return existing arrangement to former combined format and a change in use from Youth Services Facility to warehousing.
Phase 3: Demolition of existing single-storey annex buildings along the eastern elevation of the VPK Packaging Ltd buildings and erection of a single-storey industrial building extension in its place to accommodate replacement production equipment and associated site works including stormwater attenuation tanks.

To find out more details on this Factory Development in Limerick Applied for on 2021-02-10 take the free trial here.