The proposed development will consist of the following: change of use from office to hotel use of the first, second, third and fourth floor levels of Dame House ( a five storey over basement end of terrace building ) internal and external modifications to facilitate this change of use including amalgamation of Dame House with the existing Mercantile Hotel ( a six storey over basement mid-terrace building ); modifications to all elevations including associated signage; and internal modifications / reconfiguration of and refurbishments to the existing Mercantile Hotel. Planning Permission is also sought for a five storey hotel extension to the rear ( first, second, third, fourth and fifth floor levels ) and an extension of the existing fifth floor ( mansard ) level to now provide a fifth floor level across the entirety of the buildings i.e. resulting in a 79 bed, six storey over basement hotel ( with breakfast / dining area & residents bar and ancillary accommodation ) with plant area at roof level; and all associated site engineering works necessary to facilitate the development.

To find out more details on this Hotel & Guesthouse Development in Dublin Applied for on 2017-12-14 take the free trial here.


Address:
The Mercantile Hotel

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL