Permission is sought for Amendments to the development previously granted planning permission, ref: 10/34698, PL28.239383 on the central area (Zone B) incorporating the Counting House and Brewery Building behind as follows: Increase of ground floor retail space from 1,161m² to 1,394m²; reconfiguring of the previously granted 7 cinema screens, totalling an area of 2,929m² across 3 floors; into proposed Office/Educational spaces across 4 floors totalling an area of 6,543m² ; Modifications in the plan form of all floors; Modifications of all external elevations to include the reduction in overall height of the building; replacing cladded finish to upper floor with glazed and metal panelled facades; Modifications to the external finishes of all elevations and glazing.

To find out more details on this Retail Development in Cork Started on 2018-10-23 take the free trial here.


Address:
55-60

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL