The development consist of minor amendments to the previously permitted development (DCC Reg. Ref. 3608/17) incorporating the expansion and internal rationalisation of the previously permiited rooftop plant area (with an overall increase in area of 165sqm) on the hotel to the east of the site; an increase in the height of the lift overrun of 1.6m; an increase in height of the enclosed plant room parapet of between 0.4m and 0.7m; and the installation of a total of 68no. photovoltaic panels on the roof of the previously permitted apartments.
To find out more details on this Hotel & Guesthouse Development in Dublin Granted permission on 2020-08-18 take the free trial here.