Permission for the development which will consist of works to building 2 mod 3 comprising alterations to the previously granted permission (ref. No. 19/309). The alterations will include an increase in the new floor area to 668m2 at first floor level, to be used as lab/office space with 2 no. access stairs and a lift, all within the existing building, alterations to part of the south & west facades with entrance landscaping along with west façade and the inclusion of roof lights in the existing roof. Proposed works will also include additional shower and janitor facilities within building 2 mod 1 at ground floor level.
To find out more details on this Office Development in Galway Started on 2021-01-04 take the free trial here.