Extension of permission (the construction of an extension. This is to include an assembly room on ground floor and nine en-suite bedrooms and associated day room and nurses station on first floor. Drainage is to connect to the existing site drainage system & all associated site works. Retention of 1. Construction of enclosed oil tank and generator area to the north east of building. 2. Insertion of a doorway into former chapel beneath the porch area. 3. Construction of a staircase within the former chapel area to access doorway above. 4. Construction of a main fuel supply storage facility (this application related to a protected structure m36 l/m(23))
To find out more details on this Care Home Development in Limerick Granted permission on 2017-05-17 take the free trial here.

