1. Demolition of existing boiler house and overhead walkway canopy located adjacent to the existing student accommodation blocks. 2. Construction of a three storey building consisting 125 student bedroom accommodations, seminar rooms, day spaces, caretakers/security office, laundry, and plant rooms, totaling 3975sq.m and identified as Block 1 on the accompanying drawings. 3. Construction of a three-story building consisting of 41 student bedroom accommodations, seminar rooms, day spaces, managers office, laundry, and plant rooms, totaling 1506sq.m and identified as Block 2 on the accompanying drawings. 4. Creation of an internal one-way traffic system with separate vehicular entrance and exit points at existing accesses into the site. 5. Creation of pedestrian plaza between existing and proposed accommodation blacks, consisting of hard and soft landscaping proposals including green amenity areas. 6. All public lighting, 7. Connection to the adjoining public water mains, public foul sewer network, and adjoining public stormwater network including the installation of stormwater attenuation tanks. 8. Provision of 10 car parking spaces and 195 bicycle parking spaces. 9. Provision of an ESB Sub-Station and waste collection/storage area. 10. Provision of an internal footpath network to student accommodation that will connect to the existing public footpath on Moyglare Road. 11. All ancillary site development works,
To find out more details on this Residential Development in Kildare Applied for on 2021-02-24 take the free trial here.